Choosing equipment starts with the menu, production volume, utilities, maintenance requirements, and the space available on the line. Edge handles chain accounts, reorders, and one-off replacements. The Cesario Group handles equipment as part of a coordinated project package.
The team reviews staffing, oil use, refrigeration load, stainless, millwork, installation, and future service before the package is locked. New and used options are evaluated against the same operating requirements.
Equipment records and service history stay with the project team so parts and service calls can be handled after opening.
Spec it to the menu.
The package gets chosen against the menu, the volume, the oil use, and the refrigeration load, before anyone locks in new-versus-used or signs a PO.
Coordinate delivery and installation.
Delivery, installation, and startup are scheduled against the stainless, millwork, utilities, and opening date.
Keep the equipment record with the project.
Specifications and service history remain available when a unit needs a part or technician.

